FEASIBILITY · DECIDE

From scattered docs to a structured bid/no-bid call.

Scope, evaluation weights, missing evidence and a recommended next action — pulled into one report your team reads before the deadline conversation. Walk it against a live tender inside the workspace.

What it is

Not a summary. A structured layer over the release pack — turns the docs into something your team can decide against.

  • Scope decomposition

    Every document broken into discrete scope items your team can price and resource. No deliverable chased across three PDFs.

  • Evaluation weight extraction

    Mandatory criteria, weighted scoring and pass/fail gates lifted from the evaluation plan. The buyer's rubric in one place.

  • Evidence gap analysis

    Each criterion checked against your Evidence Library. Expiring insurances, missing CVs and certification gaps flagged before kick-off.

Schematic Feasibility Report — scope, weights, evidence and recommendationFEASIBILITY REPORTPacific Highway · Section 4B · CivilBID · 87%SCOPE · 27 ITEMSWEIGHTS · 4 CRITERIAPRICECAPABILITYMETHODLOCALEVIDENCE · GAPS FLAGGEDPublic Liability · $20MISO 9001CV · Sr PM · QLDPast · M1 Pacific 2024RECOMMENDATIONBid · with partnerHigh fit on capability + price.One CV gap to close before lodgement.
ONE REPORT · SCOPE · WEIGHTS · GAPS · CALL

How it works

  1. STEP 01· READ

    Every document. Every page.

    Reads the full release pack — RFP, response schedules, draft contract, annexures, addenda. Nothing skipped because the team ran out of time on a Friday.

  2. STEP 02· STRUCTURE

    Scope items, weights, gaps.

    Decomposed into scope items mapped to deliverables, criteria mapped to weights, and each criterion cross-checked against your evidence library.

  3. STEP 03· RECOMMEND

    A bid/no-bid call with rationale.

    Bid, no-bid or partner — with a one-screen rationale your bid manager and BD lead can walk into the deadline conversation already aligned on.

What it changes

“The bid/no-bid call stopped being a PDF rummage. We walked in already aligned — and said no to two we'd have chased on instinct.”

BID MANAGER · TIER 1 CIVIL · PRIVATE PREVIEW
Hours → minutes
TIME · TO BID/NO-BID DECISION

Structured report replaces a 90-minute PDF read.

2–3×
NO-BID RATE · ON LOW-FIT WORK

Teams walk away earlier, with the evidence behind it.

+18 pts
WIN-RATE · ON BIDS YOU CHOOSE

Effort concentrates on opportunities you actually fit.

Composite figures from private-preview cohort patterns. Indicative, not contractual.

FEASIBILITY REPORT

Walk into the bid/no-bid call already decided.

A 30-minute demo against a live release pack. We structure the scope, weights and evidence gaps in front of you.